How to read an event-contract ladder as a probability distribution
Turn a ladder of "above X" event-contract prices into the probability of each range, an implied mean and median, and the most likely outcome, with spreadsheet formulas. Worked on a hypothetical CPI ladder.
Kalshi lists event contracts on measurable outcomes: whether CPI rises more than a given amount, where an index closes, how high the temperature gets. Each contract pays $1 if its outcome happens and nothing if it doesn't, so its price, between $0 and $1, reads roughly as the market's probability.
For a number like CPI, Kalshi lists a ladder: one contract per strike, each asking "will it be above X?" One price tells you a single probability. The whole ladder tells you what the market expects across every outcome, if you turn it into a distribution. This guide does that in a spreadsheet, on a hypothetical ladder for next month's CPI change.
The ladder
| Contract | Yes price |
|---|---|
| CPI rises more than 0.0% | $0.92 |
| CPI rises more than 0.1% | $0.80 |
| CPI rises more than 0.2% | $0.55 |
| CPI rises more than 0.3% | $0.27 |
| CPI rises more than 0.4% | $0.10 |
| CPI rises more than 0.5% | $0.03 |
Each price is a cumulative probability: 92% that CPI rises more than 0.0%, 80% that it rises more than 0.1%, and so on. They have to fall as the strike rises. If one doesn't, something is off (a stale trade, a wide spread), and that strike needs a closer look before you use it.
Use a consistent price for every strike: the midpoint of the bid and the ask is usually better than the last trade, which can be hours old.
Step 1: The probability of each range
The chance CPI lands between two strikes is the difference between their "above" prices. With strikes in column A and prices in column B starting in row 2:
| Range | Formula | Probability |
|---|---|---|
| 0.0% or less | =1-B2 |
8% |
| 0.0% to 0.1% | =B2-B3 |
12% |
| 0.1% to 0.2% | =B3-B4 |
25% |
| 0.2% to 0.3% | =B4-B5 |
28% |
| 0.3% to 0.4% | =B5-B6 |
17% |
| 0.4% to 0.5% | =B6-B7 |
7% |
| Above 0.5% | =B7 |
3% |
Add a total row with =SUM(...). Here it is exactly 100% because the prices are consistent. On real prices it is often a point or two off, from bid-ask spreads and fees; divide each probability by the total to normalize before going further.
Step 2: The implied mean
Give each range a midpoint: 0.05% for 0.0% to 0.1%, and so on. The two open-ended ranges need a choice; half a step beyond the end strikes (−0.05% and 0.55%) is a simple, stated assumption. Then:
Implied mean = SUMPRODUCT(Probabilities, Midpoints) → 0.217%
The mean is sensitive to the open-ended midpoints. Change −0.05% to −0.15% and see how far it moves; if it moves a lot, the tails are carrying the answer and you should say so.
Step 3: The median and the most likely range
The median is where the cumulative probability crosses 50%. Running the probabilities up from the bottom: 8%, 20%, 45%, then 73%. It crosses inside the 0.2% to 0.3% range. Interpolating linearly inside that range:
Median ≈ 0.2% + (50% − 45%) / 28% × 0.1% → about 0.218%
The most likely range is the one with the highest probability, found with INDEX and MATCH:
=INDEX(Ranges, MATCH(MAX(Probabilities), Probabilities, 0)) → 0.2% to 0.3%
Step 4: Put it in context
A distribution is most useful next to something else:
- A published forecast. Put the consensus estimate beside the implied mean and median, and the chance the market gives to outcomes above it.
- The same ladder over time. Snapshot the prices daily and watch how the distribution shifts as the release gets closer.
- Past releases. After many releases, compare what ladders implied the day before with what was printed (see the companion guide on backtesting event contracts).
Keep in mind what the numbers are: prices at one moment, with spreads and fees inside them. A market's implied distribution is a summary of what traders were willing to pay, not a forecast you should rely on by itself.
Frequently asked questions
Is an event contract's price a probability?
Roughly. A contract that pays $1 trading at $0.27 implies about a 27% chance. Bid-ask spreads, fees and how actively it trades all blur that reading, so treat it as an estimate.
Why don't my ladder's probabilities add to 100%?
Usually because the prices come from different moments or include spreads. Use bid-ask midpoints taken at the same time, check that prices fall as strikes rise, and normalize by the total.
Can Jordan pull a Kalshi ladder for me?
Yes. With your own Kalshi key connected, Jordan's agent pulls a ladder's strikes and prices into a sheet and builds this distribution with formulas. The connection is read-only: Jordan never trades.